Gas / Electric Service Requirements

  1. Gas Service Requirements
  2. Electric Service Requirements

Gas Service Requirements

  • Complete gas piping installation and pressure test.
  • Complete the Cedar City Gas Clearance Form before the inspection.
  • Schedule a gas clearance inspection online. This can be done in conjunction with 4 way/ rough inspection.
  • Please attach gas clearance form to online permit or have gas clearance form on the job site located by the gas meter main pipe at the time of inspection.